| 1 |
Cumulative, Total KWH |
kwh |
15.8.0 |
|
| 2 |
Cumulative, Rate-A KWH (Peak) |
kwh |
15.8.1 |
|
| 3 |
Cumulative, Rate-B KWH (Off Peak) |
kwh |
15.8.2 |
|
| 4 |
Cumulative, Total KVARH Leading |
kvarh |
3.8.0 |
|
| 5 |
Cumulative, Rate-A KVARH Leading (peak) |
kvarh |
3.8.1 |
|
| 6 |
Cumulative, Rate-B KVARH Leading (Off Peak) |
kvarh |
3.8.2 |
|
| 7 |
Cumulative, Total KVARH Lagging |
kvarh |
4.8.0 |
|
| 8 |
Cumulative, Rate-A KVARH Lagging (peak) |
kvarh |
4.8.1 |
|
| 9 |
Cumulative, Rate-B KVARH Lagging (Off Peak) |
kvarh |
4.8.2 |
|
| 10 |
Instantaneous Demand |
kw |
15.7.0 |
|
| 11 |
Instantaneous Voltage Phase A |
voltage A |
32.7.0 |
|
| 12 |
Angle Voltage Phase A |
Angle Voltage A |
81.7.0 |
|
| 13 |
Instantaneous Voltage Phase B |
voltage B |
52.7.0 |
|
| 14 |
Angle Voltage Phase B |
Angle Voltage B |
81.7.1 |
|
| 15 |
Instantaneous Voltage Phase C |
voltage C |
72.7.0 |
|
| 16 |
Angle Voltage Phase C |
Angle Voltage C |
81.7.2 |
|
| 17 |
Instantaneous Current Phase A |
I A |
31.7.0 |
|
| 18 |
Angle Current Phase A |
Angle Current A |
C 4.60 |
|
| 19 |
Instantaneous Current Phase B |
I B |
51.7.0 |
|
| 20 |
Angle Current Phase B |
Angle Current B |
C 4.69 |
|
| 21 |
Instantaneous Current Phase C |
I C |
71.7.0 |
|
| 22 |
Angle Current Phase C |
Angle Current C |
C 4.6A |
|
| 23 |
Instantaneous Power Factor |
P.F |
13.7.0 |
|
| 24 |
Maximum Demand |
K W (M) |
1.6.0 |
|
| 25 |
Cumulative Maximum Demand |
K W (C) |
1.2.0 |
|
| 26 |
Maximum Demand reset Date |
Date |
1.6.0 |
|
| 27 |
Maximum Demand reset Times |
Times |
1.6.0 |
|
| 28 |
Previous month Cumulative Total KWH |
kwh |
1.8.0.1 |
|
| 29 |
Previous month Cumulative Rate-A KWH (peak) |
kwh |
1.8.1.1 |
|
| 30 |
Previous month Cumulative Rate-B KWH (Off Peak) |
kwh |
1.8.2.1 |
|
| 31 |
Previous month Cumulative Total KVARH Leading |
kvarh |
3.8.0.1 |
|
| 32 |
Previous month Cumulative Rate-A KVARH Leading (peak) |
kvarh |
3.8.1.1 |
|
| 33 |
Previous month Cumulative Rate-B KVARH Leading (Off Peak) |
kvarh |
3.8.2.1 |
|
| 34 |
Previous month Cumulative Total KVARH Lagging |
kvarh |
4.8.0.1 |
|
| 35 |
Previous month Cumulative Rate-A KVARH Lagging (peak) |
kvarh |
4.8.1.1 |
|
| 36 |
Previous month Cumulative Rate-B KVARH Lagging (Off Peak) |
kvarh |
4.8.2.1 |
|
| 37 |
Previous month Maximum Demand |
K W (M) |
1.6.0.1 |
|
| 38 |
Date of Previous month Maximum Demand |
Date |
1.6.0.1 |
|
| 39 |
Time of Previous month Maximum Demand |
Time |
1.6.0.1 |
|
| 40 |
Total Number of Outages |
Outages |
C.7.0 |
|
| 41 |
Meter Number |
Meter No |
C.1.0 |
|